Digital-DOA
Portfolio

Jeffrey Sipprell

« Synesthesia - Construction Photos 2 | | Synesthesia - Construction Photos 4 »

April 27, 2006

Synesthesia - Construction Photos 3

header-042606.jpg

On Tuesday we began the installation of the felt in the space. It's going a bit slowly as we're trying to figure a number of things out - specifically at the connection between wall and ceiling. We eventually realized that we're going to need to drill more plates to support all the weight at the top. So, here's a few photos.

Felt Assembly 1
Felt Assembly 2
Felt Assembly 3
Felt Installation 1
Felt Installation 2
Felt Installation 3
Connection 1
Connection 2
Finished Stair

Posted by jsipprell at April 27, 2006 11:22 AM

Comments

How did you end up resolving the ceiling-wall connection? I can't wait to see this thing finished. I was there in early April, and the acoustics and the glare from the lights were awful. This should make for a much more pleasant space.

Posted by: assbackward at May 9, 2006 1:52 AM

Check out the entry titled Synesthesia Construction Photos 4 - that will show you how we are trying to resolve the two systems. The walls are turning out really great.

Posted by: Jeffrey at May 16, 2006 2:59 PM

Post a comment




Remember Me?


August 2007
S M T W T F S
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31